top of page
IMG_5199.heic

Stay up to date

El Niño Update 07/16/2026

According to NOAA, El Nino has now reached "moderate" strength weeks ahead of schedule.
The World Climate Service reported temperatures in the Nino region are now 3.6 degrees Fahrenheit above average reaching the threshold for it to be considered a "super" El Nino increasing the chances from 63% to 81%. There is a strong possibility this event could be the largest since record keeping began in 1950.
 

 NOAA has released the most recent information about the 2026-2027 El Nino season below.
"There is a 63% chance of a very strong El Niño during November-January [Fig. 8] that would rank among the largest El Niño events in the historical record going back to 1950. Even very strong El Niño events do not lead to the expected impact everywhere, but stronger events can more significantly tilt the odds in favor of expected outcomes (see CPC outlooks for probabilities of seasonal anomalies). In summary, El Niño conditions are present and expected to strengthen into the Northern Hemisphere winter 2026-27."

El Niño 2026-2027

As of September 1st 2025 the new general permit is increasing regulations and compliance effecting projects previously grandfathered in from the 2009 permit. The updated Construction General Permit significantly increases the compliance burden by requiring more frequent inspections, enhanced monitoring, and direct adherence to Total Maximum Daily Load (TMDL) limits for projects that discharge into sensitive waterways.

CGP 2022

Inlet Protection

Being in business for over 30 years, BTC Inc specializes in comprehensive Stormwater Pollution Prevention Plans (SWPPP), ensuring your site remains in full compliance with all local, state, and NPDES permit standards to avoid costly fines. Our dedication goes beyond paperwork, focusing on the practical implementation of Best Management Practices (BMPs), Erosion and Sediment Control, and long-term asset maintenance

BMP Installs

Maximize site compliance and minimize environmental impact by partnering with us for expert installation of all your project's Best Management Practices (BMPs). We ensure every silt fence, sediment basin, and erosion control measure is professionally implemented to protect water quality and keep your construction on schedule.

Trenching Silt Fence

SWPPP Inspections

Our Certified SWPPP Inspectors conduct thorough and timely site evaluations, identifying potential issues before they become costly violations. We ensure your project's compliance is always maintained, protecting you from regulatory fines and project delays.

Wattle BMPs

WPCP

For smaller projects, our Water Pollution Control Plan (WPCP) services offer a simplified, cost-effective approach to meeting local stormwater regulations. We develop and implement the necessary controls to prevent runoff and sediment loss without the burden of a full SWPPP with our in-house QSD.

SWPPP

Contact

760-277-7085

  • Facebook
  • Twitter
  • LinkedIn
  • Instagram

Thanks for submitting!

San Diego, Riverside, Orange, and LA counties

Service Areas

Phone:

Brian: 760-277-7085 or David 951-440-8341

Email:

  • Instagram
  • Facebook
  • LinkedIn

Specializing in Construction & Residential / Commercial Inspections, License Number CGL B942755, CA Q.S.P #441, CISEC #540

bottom of page